Questions and Answers

What’s the remodeled entrance going to look like?

The image shown is a conceptual rendering intended to illustrate the overall direction of the renovation, including the proposed stucco finish. It is not the final design. Elements such as the lettering, font, landscaping, and other details are still being evaluated and will be finalized before construction begins.3/ Did you consider painting the existing brick?

Did you consider painting the existing brick?

Yes. That was our original plan, but after a thorough evaluation, it became clear that painting would only mask-not solve-the underlying problems. After approximately 65 years, the stamped concrete surface is deteriorating from weather and landscape damage. Both entrance walls have visible cracking, sections have shifted from their original position, and the south wall has separated from an adjoining column. A fresh coat of paint would only draw attention to these issues and would not provide a durable, long-term solution.

What will happen to the lighthouse?

The lighthouse will remain in tact, as is. It’s structurally sound, freshly painted and the light at the top of the lighthouse works.

How did you arrive at a budget of $26k – $30k?

Our fundraising goal is based on bids we received from several local general contractors for the scope of work developed by the committee. You can review the complete Scope of Work in the Files section of this Facebook page. We began soliciting bids in September 2025.

Contractors have advised us that some price adjustments should be expected as the project approaches construction due to increases in material and labor costs.

In addition, because there are no known original plans or construction records for the existing entrance walls, hidden structural issues may be discovered once demolition begins. For that reason, our fundraising goal includes a contingency to help cover unforeseen expenses.

If the project is completed under budget, any remaining funds will be reserved for future maintenance and repairs of the entrance. Currently, there is no dedicated reserve fund to cover ongoing upkeep or unexpected repairs.

What is the anticipated timeline?

Construction will begin once we have raised the full cost of the project. Because our neighborhood does not have an HOA or reserve funds to draw from, we must secure the entire project budget before work can begin. This ensures the project can be completed without interruption or the need for additional fundraising.

What happens to donated funds if the goal is not met?

We view this as a “when,” not “if” project and will continue fundraising until we reach our goal.

The entrance walls have deteriorated to the point where delaying repairs will only allow the damage to worsen, likely resulting in a more extensive and costly project in the future. All funds raised will remain dedicated to the entrance renovation project.

Who is in charge of the money?

Donated funds are held in a dedicated North Waterway Estates checking account at TD Bank.

Although the account is linked to the South Patrick Residents Association (SPRA), a 501(c)(3) nonprofit, it is maintained separately and is not commingled with SPRA funds. The account is managed by the SPRA Treasurer, with the SPRA Secretary serving as a co-signer, and the SPRA President also having account access. This structure provides oversight and accountability for all donated funds.

What more can our neighbors do to help?

We’re glad you asked! Right now, the biggest need is financial support so we can reach our fundraising goal as soon as possible. We also need you to help spread the word to your friends and neighbors! As the project moves forward, additional volunteer opportunities will become available-from helping distribute fundraising materials door-to-door to assisting with future project needs.

If we haven’t reached our goal by the time the weather cools this fall, we have a few fun tundraising ideas up our sleeves that will bring neighbors together while raising money for the project. Stay tuned-it’s our community, and together we can make it something we’re all proud of.

Why not knock down both the north & south walls and build new?

Short answer: the expense is too great. Long answer: Both north and south walls sit within a Brevard County easement (the county owns the land), to demolish current walls and rebuild requires extensive permitting, design input from the county and 2x-3x the expense,
potentially into six-figures.

Can we just replace the letters/sign?

Unfortunately, no. The stamped brick surface behind the current sign is deteriorating and crumbling due to age and weather. Simply replacing the letters would not provide a lasting solution. A new stucco base is needed to properly support and secure the new powder-
coated aluminum lettering.